1. Tender conditions

Tianjin Branch’s Refining Department Integrated Diesel Tank Zone Four diesel tanks diverted coal project has been awarded by China Petroleum & Chemical Corporation Tianjin Branch “About Tianjin Branch’s Refining Department Integrated Diesel Tank Zone Four Diesel Tanks Diverted Coal Project "Approval of basic design" (SINOPEC MJT [2017] No. 288) was approved for construction. The bidder was China Petroleum & Chemical Corporation Tianjin Branch. The construction fund was self-raised by the company and the investment ratio was 100%. The general contracting for the construction of the diverted coal project for the four diesel tanks diverted into coal from the refinery department of the Tianjin Branch has been subject to the tendering conditions and is now undergoing an open tender, inviting potential interested bidders to participate in the tender.
2. Project Overview and Bidding Scope
2.1 Bidding Project Name: Tianjin Branch's Refining Department Integrated Diesel Tank Zone Four diesel tanks diverted coal project.
2.2 Construction Site: Tianjin Binhai New Area (Dagang).
2.3 Construction Scale: Not applicable.
2.4 Construction Investment: The total investment of the project is 9,793,500 yuan (the value-added tax of equipment materials has been deducted 1,157,800 yuan), and the construction fee for this bid is about 4,180,000 yuan.
2.5 Plan duration: 171 days (since the start of the work date and ending on the date of completion).
It is planned to start work on January 10, 2018, and pay it on June 20, 2018, and on June 30, 2018.
2.6 Division: One bid section.
2.7 tender range of tenders:
The installation and construction of buildings within the scope of basic design mainly includes:
(1) The four dome diesel tanks 415#, 416#, 417#, and 418# in the comprehensive oil tank section of the Refining Department were converted to internal floating roof tanks, with the conditions for storage of jet fuel.
(2) Increase the incoming flow of four sets of jet coal hydrogenation (DN200), 1# hydrocracking (DN150), 2# hydrocracking (DN150) and 400,000 tons/year aviation coal hydrogenation (DN150); Increase the adding and reconciling flow of four tanks; increase the inverted tank flow (DN250) between the integrated aviation tank area, heavy oil tanker area, and four tanks; add four tanks to pay the airport (DN250), pay Terminal (DN350) and train stacker (DN400) factory processes.
3. Bidder qualification requirements
3.1 The bidder should have the following basic qualifications:
(1) An independent legal person registered in the territory of the People's Republic of China;
(2) Qualification Certificate of Grade 2 and above for general contracting of petrochemical engineering projects issued by the competent administrative department:
(3) Holding an effective safety production license issued by the construction administrative department;
(4) Hold an effective quality management, environmental management, occupational health and safety management system certification;
(5) The construction performance of petrochemical auxiliary projects with a single contract amount of RMB 4 million or above since 2014 (accepted by the acceptance date of the production and delivery);
(6) The company is in good financial condition, has sufficient assets and capabilities and effectively performs the contract;
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 The qualifications of the bidders for this bid invitation are as follows:
(1) The project manager holds the qualification of first-class registered constructor of mechanical and electrical engineering profession (registered in the bidder unit), and possesses a valid certificate of safety assessment of the person in charge of the project of the construction enterprise (B certificate). Since 2014,ç«£) The acceptance time of the project shall prevail. The performance of the construction project manager of a petrochemical auxiliary project with a single contract amount of 4 million yuan and above shall not be part-time other projects during the contract period of the project;
(2) The person in charge of technology has advanced engineering and above technical titles;
(3) The person in charge of safety shall hold a certificate (C certificate) for the safety production assessment of the full-time production safety management personnel of construction companies.
3.4 This tender qualification review method: After qualification review.
3.5 Potential bidders should carefully consider and decide whether to participate in the bidding of this bidding project. If you decide not to participate in the bidding after downloading the bidding documents, please notify the tenderer or the bidding agency in written (with official seal) forms (or scanned copies) five days before the deadline for the submission of the bidding documents. Otherwise, it will follow the “Sinopec Construction Market Credit The provisions of the relevant provisions of the "System Management Measures" shall provide for the processing of restricted bids.
4. Registration, registration, application for electronic seal and tender documents and related data acquisition
4.3 Obtaining Bidding Documents, Drawings and Other Related Materials
(1) Time of acquisition: From 17:00 on December 13, 2017 to 17:00 on December 18, 2017.
(2) Acquired deadline: 17 o'clock, December 18, 2017.

Polycrystalline Solar Panel

A Solar Panel, or photo-voltaic (PV) module, is an assembly of photo-voltaic cells mounted in a framework for installation. Solar panels use sunlight as a source of energy to generate direct current electricity.


The main two types of solar panels. Each of these types of solar cells is made in a unique way and has a different aesthetic appearance.

  1. Mono crystalline
  2. Poly crystalline
ERG 310P

Polycrystalline Solar Cells,Solar Mono Panel,Poly Solar Cell,Mono Or Poly Solar Panels

NANTONG RONGCHANG IMPORT&EXPORT CO.,LTD , https://www.ergsolarcn.com